How the math works
Area: 24 ft × 20 ft = 480 sq ftVolume @ 4": 480 × (4 ÷ 12) = 160.00 cu ftAdd 10%: 160.00 × 1.10 = 176.00 cu ftCubic yards: 176.00 ÷ 27 = 6.52 yd³Tons: 6.52 × 1.4 = 9.13 tonsTruck loads: 22.81 tons ÷ 15 tons per tandem = 2
Trade pro tips
- At 4" deep, 20x24 takes 9.13 tons — a single dump truck delivery covers it.
- Build in layers: 4" of #3 (2"–3") stone, 4" of #57, then 2" of crusher run / dense grade on top.
- Lay non-woven geotextile over clay soil first — it stops stone from sinking.
- Crown the driveway ½" per foot so water sheds to the sides.
- Spread with a box blade and compact each layer before the next.
Frequently asked questions
How many tons of gravel do I need for a 20x24 driveway?
At 4" deep: 9.13 tons. At 6": 13.69 tons. A complete 3-layer driveway (4" #3 + 4" #57 + 2" crusher run) is 22.81 tons. All include 10% extra.
How many cubic yards of gravel for 20x24?
2": 3.26 yd³; 4": 6.52 yd³; 6": 9.78 yd³; 8": 13.04 yd³. 20x24 is 480 sq ft.
How many truck loads of gravel for a 20x24 driveway?
A tandem dump truck carries about 15 tons. 20x24 at 4" (9.13 t) is 1 load; the full 3-layer build (22.81 t) is 2 loads.
How much does a 20x24 gravel driveway cost?
Stone alone at 4" is about $371 (~$55/yd³). A 3-layer build runs roughly $896 in material plus 59 sq yd of fabric; delivery and grading are extra.