10x12 Gravel Driveway Calculator

Covering 10' × 12' (120 sq ft) with 4" of gravel takes 1.63 cubic yards — about 2.28 tons — with 10% extra. A full 3-layer driveway build for 10x12 is 5.70 tons. Depths, layers, truck loads and fabric are below.

Quick answer

4" gravel
1.63 yd³
Weight @ 4"
2.28 tons
3-layer driveway (10")
5.70 tons
Tandem truck loads (15 t)
1
Geotextile fabric
15 sq yd
Est. gravel cost @ 4"
$96

▍Gravel Calculator

Material
ft
in
ft
in
in
Waste Factor
$
L = 12' 0"W = 10' 0"D = 4"
Cubic Yards
1.63yd³
incl. 10% waste · Bulk delivery: order 1.75 yd³
Cubic Feet
44.00ft³
Area
120.0sq ft
Weight
2.28tons
Weight
4,563lbs
Gravel bags needed
  • 0.5 cu ft bag (~50 lb) (0.5 ft³ yield)88

Gravel for 10x12 by depth

120 sq ft, 10% waste. Crushed stone ≈ 1.4 tons/yd³, ~$55/yd³ delivered.

DepthUseCubic yardsTonsTruck loadsBulk est.
2"Top dressing / refresh0.81 yd³1.141$55
4"Top layer (#57 stone)1.63 yd³2.281$96
6"New pad on firm soil2.44 yd³3.421$138
8"New driveway on soft soil3.26 yd³4.561$193

3-layer gravel driveway build for 10x12

The standard US build for a driveway that won’t rut: big stone base, mid-size stone, fines on top.

LayerDepthCubic yardsTons
#3 stone (1"–2½") base4"1.63 yd³2.28
#57 stone (¾"–1") middle4"1.63 yd³2.28
Crusher run / dense grade top2"0.81 yd³1.14
Total10"4.07 yd³5.70

How the math works

  1. Area: 12 ft × 10 ft = 120 sq ft
  2. Volume @ 4": 120 × (4 ÷ 12) = 40.00 cu ft
  3. Add 10%: 40.00 × 1.10 = 44.00 cu ft
  4. Cubic yards: 44.00 ÷ 27 = 1.63 yd³
  5. Tons: 1.63 × 1.4 = 2.28 tons
  6. Truck loads: 5.70 tons ÷ 15 tons per tandem = 1

Trade pro tips

  • At 4" deep, 10x12 takes 2.28 tons — a single dump truck delivery covers it.
  • Build in layers: 4" of #3 (2"–3") stone, 4" of #57, then 2" of crusher run / dense grade on top.
  • Lay non-woven geotextile over clay soil first — it stops stone from sinking.
  • Crown the driveway ½" per foot so water sheds to the sides.
  • Spread with a box blade and compact each layer before the next.

Frequently asked questions

How many tons of gravel do I need for a 10x12 driveway?

At 4" deep: 2.28 tons. At 6": 3.42 tons. A complete 3-layer driveway (4" #3 + 4" #57 + 2" crusher run) is 5.70 tons. All include 10% extra.

How many cubic yards of gravel for 10x12?

2": 0.81 yd³; 4": 1.63 yd³; 6": 2.44 yd³; 8": 3.26 yd³. 10x12 is 120 sq ft.

How many truck loads of gravel for a 10x12 driveway?

A tandem dump truck carries about 15 tons. 10x12 at 4" (2.28 t) is 1 load; the full 3-layer build (5.70 t) is 1 load.

How much does a 10x12 gravel driveway cost?

Stone alone at 4" is about $96 (~$55/yd³). A 3-layer build runs roughly $224 in material plus 15 sq yd of fabric; delivery and grading are extra.